**City Commission & CRA Meeting Agendas | CLICK HERE**
CHIEF SARA MOONEY, WPBPD ANNOUNCE 2018 ANNUAL REPORT, 2019 STRATEGIC PRIORITIES

WPBPD’s primary focus is to decrease all violent crime and continue the success the department has had addressing property crime—which was down 21%

Learn More
MAYOR'S VILLAGE INITIATIVE CO-HOSTS 'A DAY IN THE LIFE : REENTRY SIMULATION'

Impactful event showcases the daily challenges of individuals reentering society after incarceration

Learn More
ROAD & DOCK CLOSURES UPDATE: WEEK OF FEBRUARY 24, 2019
City of West Palm Beach Road and Dock Closure Updates are issued weekly
CITY OF WEST PALM BEACH CLOSURES
ENGINEERING
  • 700 block of Dixie Hwy. (through Monday, February 25, 2019): Full road closure for sewer line replacement.  Detour signs are posted to assist motorists.
  • Windsor Ave. at 36th St. (through mid-April): Full road closure at the intersection for installation of water, sewer and drainage piping along Windsor Ave. from Service Rd. to 37th St.  Detour signs are posted to assist motorists.  
  • Spruce Ave. at 29th St. (until further notice): Sections of Spruce Ave., including the intersection at Spruce Ave. and 29th St. will be closed for roundabout, curb, sidewalk and driveway replacement.  Signs are posted to assist motorists.
  • Gregory Pl. between S. Olive Ave. and Gregory Rd. (through March 2019): Road closed, Monday through Friday, 7:30a.m.-5:00 p.m., for storm drainage improvements.
  • Cumberland Dr. between Military Tr. and Village Blvd. (through March 2019): Reduced speeds for bicycle lane separator installation and pavement marking. Signs will assist motorists. 
 
EVENT CLOSURES
  • Clematis by Night – produced by City of WPB Community Events (Thursday, February 28, 2019, 6:00 p.m. – 9:00 p.m.): Road closure on North Clematis St. and South Clematis St. between Narcissus Ave. and Flagler Dr., Narcissus Ave. between Clematis St. and Banyan Blvd.
  • Bam Book & Music Festival produced by Jennifer McQuown (Saturday, March 2, 2019): Full road closure for the 400 block of Clematis St.
  • GreenMarket produced by City of WPB Community Events (Saturday, March 2, 2019, 6:00 a.m. - 3:00 p.m.): Road closures on North Clematis St. and South Clematis St. between Narcissus Ave. and Flagler Dr.; Narcissus Ave. between Banyan Blvd. and Clematis St.; Lantana Ave. between Banyan Blvd. and Clematis St.
  • West Palm Beach Antique Flea & Craft Market produced by Bill Jacobson (Saturday, March 2, 2019, 6:00 a.m. – 4:00 p.m.): Full road closure for the 300 block of Clematis St.
  • JDRF One Walk produced by Juvenile Diabetes Research Foundation (Saturday, March 2, 2019, 8:30 a.m.-12:00 p.m.): Road closure on Flagler Dr. from Banyan Blvd. to Diana Pl.
  • Autism Speaks Walk produced by Autism Speaks (Sunday, March 3, 2019, 8:00 a.m.-12:00 p.m.): Full road closure on Flagler Dr. between 5th St. and Lakeview Ave.
 
 
 
CLOSURES, REPAIRS FOR CURRIE PARK BOAT RAMPS
  • Full closure: All Currie Park boat ramps at 2400 Flagler Drive are closed for repairs. Reopening is expected in Spring 2019. Ramps will not be accessible during the construction period. Currie Park will remain open from sunrise to sunset.
 
PRIVATE ROAD CLOSURES (CITYPLACE)
  • Rosemary Ave. between Okeechobee Blvd. and Hibiscus St. (through Friday, April 12, 2019): Full closure by CityPlace for CityPlace streetscape improvements. Access to all parking garages will be maintained.
  • Hibiscus St. between Rosemary Ave. and Quadrille Blvd. (until further notice): Full closure by CityPlace for CityPlace streetscape improvements. Access to parking garages from Quadrille Blvd. will be maintained.
  • For more information: https://www.futureofcityplace.com/.
 
PALM BEACH COUNTY (PBC) ENGINEERING & PUBLIC WORKS CLOSURES IN CITY OF WPB
  • Old Okeechobee Rd. approximately 550 feet east of Church St. (until further notice): Periodic westbound lane closures with flaggers controlling traffic for fire line installation.
  • Old Okeechobee Rd. approximately 30 feet west of N. Florida Mango Rd. (until further notice): Periodic eastbound and westbound lane closures with flaggers controlling traffic for water main installation. 
  • Belvedere Rd. at the southwest corner of Congress Ave. (until further notice): Periodic eastbound right lane closures for water main installation.
  • Australian Ave. and Palm Beach Lakes Blvd. (until further notice): Periodic lane closures for intersection improvements.
  • Community Dr. at 12th St. (until further notice): Periodic westbound right lane closures.  Periodic westbound left lane closures with shifts to the eastbound lane for water main installation.
  • 45th St. from Greenwood Ave. to US-1/Broadway Ave (until further notice): Periodic lane closures with flaggers controlling traffic for pavement markings.
  • Congress Ave. 600 ft. south of Presidential Wy. (until further notice): Periodic northbound and southbound lane closures for an FPL utility project.
  • For more information, contact PBC Engineering & Public Works: (561) 684-4000 or
http://discover.pbcgov.org/.
 
FLORIDA DEPT OF TRANSPORTATION (FDOT) CLOSURES IN CITY OF WPB
  • Flagler Memorial Bridge between City of West Palm Beach and Town of Palm Beach (through March 4, 2019, Mondays only, 9:00 a.m. – 4:00 p.m.) will have the outside eastbound lane and the south sidewalk closed for handrail replacement.
  • Okeechobee Blvd. from Suwanee Dr. to just west of Chillingworth Dr. (through March 1, 2019) will have the outside westbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, for AT&T duct installation.
  • Military Tr. between 45th St. and Shiloh Dr. (through Friday, March 8, 2019) will have one northbound lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, for FPL maintenance operations.
  • Quadrille Blvd. between Evernia St. and Gardenia St. (through Friday, March 8, 2019): The inside lane of Quadrille Blvd. is closed in each direction, around-the-clock, for turn lane construction and mast arm installation. Please note the speed limit in this area will be adjusted to 25 miles per hour during this time.
  • Okeechobee Blvd. from Quadrille Blvd. to Flagler Dr. and Quadrille Blvd from Okeechobee Blvd. to Clematis St. (through March 22, 2019) will have intermittent lane and sidewalk closures in each direction, 9 a.m. until 3:30 p.m., Monday through Friday, for directional boring and conduit installation.
 
City of West Palm Beach Road and Dock Closure Updates are issued weekly by the City and may be viewed online at http://wpb.org/News-Video/Road-Closure-Updates.