**City Commission & CRA Meeting Agendas | CLICK HERE**
**WPB Offers Yard Waste Amnesty Days for Advance Hurricane Season Preparation**
**April 22 – May 31 | Click Here**
ROAD & DOCK CLOSURES UPDATE: WEEK OF MAY 26, 2019

The weekly listing of closures around the City of West Palm Beach

Learn More
VISION ZERO WEST PALM BEACH TASK FORCE CELEBRATES SIGNING OF FLORIDA HOUSE BILL 107

The widely supported bill makes texting while driving a primary offense

Learn More
ROAD & DOCK CLOSURES UPDATE: WEEK OF MAY 12, 2019
City of West Palm Beach Road and Dock Closure Updates are issued weekly
CITY OF WEST PALM BEACH CLOSURES
ENGINEERING
  • 200 block of Clematis St. (Monday, May 13, 2019 through October 2019): Full road closure for streetscape project. All pedestrian walkways to restaurants and businesses remain open.
  • Windsor Ave. at 36th St. (until further notice): Full road closure at the intersection for installation of water, sewer and drainage piping along Windsor Ave. from Service Rd. to 37th St. Detour signs are posted to assist motorists.
  • Lake Ave. between Maddock St. and Hanson St. (until further notice): Intermittent northbound and southbound lane closures, 9:00 a.m. until 4:00 p.m., Monday through Friday, for milling and resurfacing. Flaggers will assist motorists in the work zone.
  • Spruce Ave. at 27th St. (until further notice): Sections of Spruce Ave. will be closed for curb, sidewalk and driveway replacement. Signs are posted to assist motorists.
EVENT CLOSURES
  • Clematis Groundbreaking produced by City of West Palm Beach CRA (Monday, May 13, 2019 8:00 a.m. - 10:00am): Full road closure 200 block of Clematis St.
  • Clematis by Night produced by City of West Palm Beach Community Events (Thursday, May 16, 2019, 6:00 p.m. – 9:00 p.m.): Road closure on N. Clematis St. and S. Clematis St. between Narcissus Ave. and Flagler Dr., Narcissus Ave. between Clematis St. and Banyan Blvd.
  • Bill Bone State CRIT Championship (Saturday, May 18, 2019 6:00 a.m.- 8:30 p.m.): Road closure for Flagler Dr. between Banyan Blvd. to Lakeview Ave.  
  • West Palm Beach Antique Flea & Craft Market produced by Bill Jacobson (Saturday, May 18, 2019, 5:00 a.m.-4:00 p.m.): Full road closure for 300 block of Clematis.
CLOSURES, REPAIRS FOR CURRIE PARK BOAT RAMPS
  • Full closure: All Currie Park boat ramps at 2400 Flagler Drive are closed for repairs, with reopening expected in late May 2019. Currie Park will remain open from sunrise to sunset.

PRIVATE ROAD CLOSURES ROSEMARY SQUARE (CITYPLACE)
  • Hibiscus St. between Rosemary Ave. and Sapodilla Ave. (Tuesday, April 23, 2019 – Saturday, June 15, 2019): Hibiscus St. closed between Rosemary Ave. & Sapodilla Parking Garage. All sidewalks will be open for pedestrian traffic.
  • For more information: http://www.cityplace.com/rosemarysquare/
 
PALM BEACH COUNTY (PBC) ENGINEERING & PUBLIC WORKS CLOSURES IN CITY OF WPB
  • Haverhill Rd. approximately 285 feet south of David S. Mack Dr. to Willow Pond Rd. (until further notice): Periodic northbound right lane closures for FPL pole replacement.
  • Roebuck Rd. from Jog Rd. to Haverhill Rd. (until further notice): Periodic lane closures for road construction. 
  • 45th St. approximately 20 feet east of Lake Arjaro Dr. to approximately 413 feet west of Village Blvd. (until further notice): Periodic east and westbound lane closures for FPL pole replacement.
  • 45th St. approximately 96 feet east of Military Tr. to approximately 413 feet west of Village Blvd. (until further notice): Periodic eastbound lane closures for FPL pole replacement.
  • Australian Ave. approximately 95 feet east of Military Tr. approximately 413 feet west of Village Blvd (until further notice): Periodic eastbound lane closures for FPL pole replacement.
  • Australian Ave. and Palm Beach Lakes Blvd. (until further notice): Periodic lane closures for intersection improvements.
  • Palm Beach Lakes Blvd. approximately 300 feet east of Executive Center Dr.to Congress Ave. (until further notice): Periodic eastbound and northbound lane closures for storm drain maintenance.
  • Palm Beach Lakes Blvd. at SW corner of Congress Ave. (until further notice):  Periodic eastbound right turn lane, westbound left turn lane, and southbound lane closures.
  • Congress Ave. approximately 145 feet south of Presidential Way. (until further notice): Periodic southbound lane closures for storm drain maintenance.
  • Belvedere Rd. approximately 210 feet east of Perimeter Rd./Florida Mango Rd. (until further notice): Periodic eastbound right lane closures for road construction.
  • Belvedere Rd. at Florida Mango Rd./Perimeter Rd. (until further notice): Periodic northbound left turn lane closures, southbound shift and eastbound right lane closures. Periodic Florida Mango Rd. southbound right turn lane/westbound lane closures.
  • Belvedere Rd. at the southwest corner of Congress Ave. (until further notice): Periodic eastbound right lane closures for water main installation.
  • For more information, contact PBC Engineering & Public Works: (561) 684-4000 or http://discover.pbcgov.org/.

FLORIDA DEPT OF TRANSPORTATION (FDOT) CLOSURES IN CITY OF WPB
  • Okeechobee Blvd., from Parker Ave. to S. Dixie Hwy. (through Friday, May 17, 2019) will have one outside lane closed in each direction, intermittently, 7 a.m. until 5 p.m., Monday through Friday, for street lighting installation.
  • Military Tr. from 45th St. to Shiloh Dr. (through Friday, June 28, 2019) will have the northbound outside lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, for FPL pole replacement operations.
  • For more information, contact FDOT: (866) 336-8435 or http://www.fdot.gov/
City of West Palm Beach Road and Dock Closure Updates are issued weekly by the City and may be viewed online at http://wpb.org/News-Video/Road-Closure-Updates.