**City Commission & CRA Meeting Agendas | CLICK HERE**
**FY2020 Budget: Budget Documents, Public Input & Meetings Information | CLICK HERE**
ROAD & DOCK CLOSURES UPDATE: JULY 21, 2019

A listing of all road and dock closures in The City of West Palm Beach.

Learn More
RIBBON CUTTING, GRAND OPENING CELEBRATE WEST PALM BEACH’S NEWEST FIRE RESCUE STATION

WPBFR Station #8 to serve Ibis, Ironhorse and western communities.

Learn More
ROAD & DOCK CLOSURES UPDATE: WEEK OF APRIL 7, 2019
City of West Palm Beach Road and Dock Closure Updates are issued weekly
CITY OF WEST PALM BEACH CLOSURES
ENGINEERING
  • Windsor Ave. at 36th St. (through mid-April): Full road closure at the intersection for installation of water, sewer and drainage piping along Windsor Ave. from Service Rd. to 37th St. Detour signs are posted to assist motorists.
  • Pinewood Ave. & 25th St. (Monday, April 8, 2019 through Wednesday, April 10, 2019): Full road closure at Pinewood intersection for storm drainage project.
  • Lake Ave. between Maddock St. and Hanson St. (until further notice): Intermittent northbound and southbound lane closures, 9:00 a.m. until 4:00 p.m., Monday through Friday, for milling and resurfacing. Flaggers will assist motorists in the work zone.
  • Spruce Ave. at 28th St. (until further notice): Sections of Spruce Ave. will be closed for curb, sidewalk and driveway replacement. Signs are posted to assist motorists.
EVENT CLOSURES
  • Clematis by Night produced by City of West Palm Beach Community Events (Thursday, April 11, 2019, 6:00 p.m. – 9:00 p.m.): Road closure on N. Clematis St. and S. Clematis St. between Narcissus Ave. and Flagler Dr., Narcissus Ave. between Clematis St. and Banyan Blvd.
  • City of West Palm Beach GreenMarket (Saturday, April 13, 2019, 6:00 a.m. - 3:00 p.m.): Road closures on N. Clematis St. and S. Clematis St. between Narcissus Ave. and Flagler Dr.; Narcissus Ave. between Banyan Blvd. and Clematis St.; Lantana Ave. between Banyan Blvd. and Clematis St.
  • West Palm Beach Antique Flea & Craft Market produced by Bill Jacobson (Saturday, April 13, 2019, 6:00 a.m. – 4:00 p.m.): Full road closure for the 300 block of Clematis St.
  • 8th Annual CityPlace Art Festival produced by Howard Alan Events (Saturday, April 6, 2019 - Sunday, April 7, 2019): Road closure on Rosemary Ave. between Okeechobee Blvd. and Evernia St., and Hibiscus St. between Sapodilla Ave. & Quadrille Blvd. Road closures begin at 3:00 a.m., Saturday, April 6, 2019, through 9:00 p.m., Sunday, April 7, 2019.
CLOSURES, REPAIRS FOR CURRIE PARK BOAT RAMPS
  • Full closure: All Currie Park boat ramps at 2400 Flagler Drive are closed for repairs. Reopening is expected in Spring 2019. Ramps will not be accessible during the construction period. Currie Park will remain open from sunrise to sunset.
PRIVATE ROAD CLOSURES (CITYPLACE)
  • Rosemary Ave. between Okeechobee Blvd. and Hibiscus St. (through Monday, April 8, 2019): Full closure by CityPlace for CityPlace streetscape improvements. Access to all parking garages will be maintained.
  • For more information: https://www.futureofcityplace.com/.
   PALM BEACH COUNTY (PBC) ENGINEERING & PUBLIC WORKS CLOSURES IN CITY OF WPB
  • Belvedere Rd. at Florida Mango Rd./Perimeter Rd. (until further notice): Periodic northbound left turn lane closures, southbound shift and eastbound right lane closures. Periodic Florida Mango Rd. southbound right turn lane/westbound lane closures.
  • Belvedere Rd. approximately 210 feet east of Perimeter Rd./Florida Mango Rd. (until further notice): Periodic eastbound right lane closures for road construction.
  • Roebuck Rd. from Jog Rd. to Haverhill Rd. (until further notice): Periodic lane closures with eastbound traffic shifted to the new roadway during road construction.
  • Old Okeechobee Rd. approximately 30 feet west of Florida Mango Rd. (until further notice):
Periodic eastbound and westbound lane closures with flaggers controlling traffic for water main installation.
  • Belvedere Rd. at the southwest corner of Congress Ave. (until further notice): Periodic eastbound right lane closures for water main installation.
  • Australian Ave. and Palm Beach Lakes Blvd. (until further notice): Periodic lane closures for intersection improvements.
  • For more information, contact PBC Engineering & Public Works: (561) 684-4000 or http://discover.pbcgov.org/.
 
FLORIDA DEPT OF TRANSPORTATION (FDOT) CLOSURES IN CITY OF WPB
  • Quadrille Blvd. between Evernia St. and Gardenia St. (through Friday, May 10, 2019): The inside lane of Quadrille is closed in each direction, around-the-clock, for turn lane construction and mast arm installation. Please note the speed limit in this area will be adjusted to 25 miles per hour during this time.
  • State Rd. A1A at Flagler Dr. (through Friday, May 3, 2019) may have one lane and the shoulder closed, in each direction intermittently, 9 a.m. until 3:30 p.m., Monday through Friday, for bike lane installation.
  • Military Tr. from Green Pine Blvd. to Bear Lakes Ct. (through Friday, April 19, 2019) will have two northbound lanes closed, 9 p.m. until 5 a.m., Sunday night through Friday, for FPL pole replacement operations.
  • Okeechobee Blvd. from Church St. to I-95 (through Friday, April 19, 2019) will have one eastbound outside lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, for water main installation.
  • Military Tr. from 45th St. to Shiloh Dr. (beginning Monday, April 8, 2019 through Friday, June 28, 2019) will have the northbound outside lane closed, 9 a.m. until 3:30 p.m., Monday through Friday, for FPL pole replacement operations.
  • For more information, contact FDOT: (866) 336-8435 or http://www.fdot.gov/
City of West Palm Beach Road and Dock Closure Updates are issued weekly by the City and may be viewed online at http://wpb.org/News-Video/Road-Closure-Updates.
 
 
Return to top of page