**City Commission & CRA Meeting Agendas | CLICK HERE**
**WPB Offers Yard Waste Amnesty Days for Advance Hurricane Season Preparation**
**April 22 – May 31 | Click Here**
ROAD & DOCK CLOSURES UPDATE: WEEK OF MAY 26, 2019

The weekly listing of closures around the City of West Palm Beach

Learn More
VISION ZERO WEST PALM BEACH TASK FORCE CELEBRATES SIGNING OF FLORIDA HOUSE BILL 107

The widely supported bill makes texting while driving a primary offense

Learn More
ROAD & DOCK CLOSURES UPDATE: WEEK OF MARCH 24, 2019
City of West Palm Beach Road and Dock Closure Updates are issued weekly
CITY OF WEST PALM BEACH CLOSURES
ENGINEERING
  • Parker Ave. at Hampton Rd. (through April 2, 2019): Full intersection closure as part of the Merrill Ave. Force Main Rerouting Project.  Signs will assist motorists around the work zone.
  • Windsor Ave. at 36th St. (through mid-April): Full road closure at the intersection for installation of water, sewer and drainage piping along Windsor Ave. from Service Rd. to 37th St. Detour signs are posted to assist motorists.
  • Lake Ave. between Maddock St. and Hanson St. (until further notice): Intermittent northbound and southbound lane closures, 9:00 a.m. until 4:00 p.m., Monday through Friday, for milling and resurfacing. Flaggers will assist motorists in the work zone.
  • Spruce Ave. at 27th St. (until further notice): Sections of Spruce Ave. will be closed for, curb, sidewalk and driveway replacement. Signs are posted to assist motorists.

 EVENT CLOSURES
  • Palm Beach International Boat Show produced by Informa Global Exhibitions
    • (Through 5:00 p.m., Friday, April 5, 2019): Road closure for northbound lanes of Flagler Dr. from Lakeview Dr. to Banyan Blvd.;
    • (Through 5:00 p.m., Wednesday, April 3, 2019) Road closure on Narcissus Ave. from Evernia St. to Datura St.
    • (6:00 a.m., Sunday, March 24, 2019 - 5:00 p.m., Tuesday, April 2, 2019): Road closure for southbound lanes of Flagler Dr. from Lakeview Dr. to Banyan Blvd.

CLOSURES, REPAIRS FOR CURRIE PARK BOAT RAMPS
  • Full closure: All Currie Park boat ramps at 2400 Flagler Drive are closed for repairs. Reopening is expected in Spring 2019. Ramps will not be accessible during the construction period. Currie Park will remain open from sunrise to sunset.
 
PRIVATE ROAD CLOSURES (CITYPLACE)
  • Rosemary Ave. between Okeechobee Blvd. and Hibiscus St. (through Monday, April 8, 2019): Full closure by CityPlace for CityPlace streetscape improvements. Access to all parking garages will be maintained.
  • Hibiscus St. between Rosemary Ave. and Quadrille Blvd. (until further notice): Full closure by CityPlace for CityPlace streetscape improvements. Access to parking garages from Quadrille Blvd. will be maintained.
  • For more information: https://www.futureofcityplace.com/.
 
PALM BEACH COUNTY (PBC) ENGINEERING & PUBLIC WORKS CLOSURES IN CITY OF WPB
  • Belvedere Rd. at Florida Mango Rd./Perimeter Rd. (until further notice): Periodic northbound left turn lane closures, southbound shift and eastbound right lane closures. Periodic Florida Mango Rd. southbound right turn lane/westbound lane closures.
  • Roebuck Rd. from Jog Rd. to Haverhill Rd. (until further notice): Periodic lane closures with eastbound traffic shifted to the new roadway during road construction.
  • Old Okeechobee Rd. approximately 550 feet east of Church St. (until further notice): Periodic westbound lane closures with flaggers controlling traffic for fire line installation.
  • Old Okeechobee Rd. approximately 30 feet west of Florida Mango Rd. (until further notice):Periodic eastbound and westbound lane closures with flaggers controlling traffic for water main installation.
  • Belvedere Rd. at the southwest corner of Congress Ave. (until further notice): Periodic eastbound right lane closures for water main installation.
  • Australian Ave. and Palm Beach Lakes Blvd. (until further notice): Periodic lane closures for intersection improvements.
  • For more information, contact PBC Engineering & Public Works: (561) 684-4000 or http://discover.pbcgov.org/.
 
FLORIDA DEPT OF TRANSPORTATION (FDOT) CLOSURES IN CITY OF WPB
  • N. Quadrille Blvd. (State Rd. A1A) at Flagler Dr. (through Friday, March 29, 2019) may have one westbound lane and shoulder closed, 9 a.m. until 3:30 p.m., Monday through Friday, for bike lane installation.
  • Okeechobee Blvd. from Suwanee Dr. to just west of Chillingworth Dr. (through Friday, March 29, 2019) will have the outside westbound lane closed, 9:00 a.m. until 3:30 p.m., Monday through Friday, for AT&T duct installation
  • Quadrille Blvd. between Evernia St. and Gardenia St. (through Friday, May 10, 2019): The inside lane of Quadrille is closed in each direction, around-the-clock, for turn lane construction and mast arm installation. Please note the speed limit in this area will be adjusted to 25 miles per hour during this time.
  • For more information, contact FDOT: (866) 336-8435 or http://www.fdot.gov/
 
City of West Palm Beach Road and Dock Closure Updates are issued weekly by the City and may be viewed online at http://wpb.org/News-Video/Road-Closure-Updates.