ROAD & DOCK CLOSURES UPDATE: WEEK OF SEPTEMBER 22, 2019
City of West Palm Beach Road and Dock Closure Updates are issued weekly by the City
SPECIAL NOTICE:
  • Banyan Blvd. between Australian Ave. and the TriRail crossing (Friday, September 20, 2019, 10:00 p.m. through Wednesday, September 25, 2019, 5:00 a.m.); Full road closure for railroad track repairs: There will be no access to Banyan Blvd. from N. Australian Ave. or S. Australian Ave. DETOUR:
    • FROM THE NORTH: Palm Beach Lakes Blvd. east to Tamarind Ave. or Dixie Hwy. to access Banyan Blvd. from the north.
    • FROM THE SOUTH: Okeechobee Blvd. east to Tamarind Ave. or Quadrille Blvd. to access Banyan Blvd. from the south.
  • Flagler Dr. between Banyan Blvd. and Datura St. (Saturday, October 5, 2019, 5:30 a.m. until 3:00 p.m.): Full road closure of Flagler Dr. between Banyan Blvd. and Datura St. for the temporary relocation of the GreenMarket during Clematis Streetscape construction. Flagler Drive will reopen on Saturday, October 5, 2019, at 3:00 p.m.
    • Flagler Dr. between Banyan Blvd. and Datura St. will be the temporary location of the GreenMarket until Clematis Streetscape construction is complete, which is anticipated in December. (Vendors are currently unable to load in/load out.)
  • FLORIDA DEPT. OF TRANSPORATION (FDOT) ROAD CLOSURE IN CITY OF WEST PALM BEACH: Flagler Dr. between Southern Blvd and Worth Ct. N. (early October 2019 through summer 2020) will be closed for roadway construction as part of the Southern Blvd. Bridges Replacement Project. 
  • Flagler Dr. sidewalks, from Southern Blvd. to Worth Ct. N., and the Southern Blvd. south sidewalk, from Washington Rd. to Flagler Dr., will remain closed through summer 2020.
DETOURS:
  • Traffic going north of Flagler Dr. should:
    • Go west on Worth Ct. N. to Washington Rd.;
    • Go north on Washington Rd. to Southern Blvd;
    • Go east on Southern Blvd. to Flagler Dr.
  • Traffic going south on Flagler Dr. should:
    • Go west on Southern Blvd. to Washington Rd.;
    • Go South on Washington Rd. to Worth Ct N.;
    • Go east on Worth Court N. to Flagler Dr.
  • Pedestrians using Flagler Dr. between Southern Blvd. and N. Worth Ct. should:
  • Use the east Flagler Dr. sidewalk.
  • Pedestrians using Southern Blvd., between Washington Rd. and Flagler Dr. should:
  • Use the north Southern Blvd. sidewalk.
For more information, contact Angel Gardner at FDOT: (561) 855-8773.     
 
CITY OF WEST PALM BEACH ENGINEERING ROAD CLOSURES
  • Lake Ave. from Southern Blvd. to Belvedere Rd. (through May 2020): Intermittent single-lane closures for resurfacing, curb restoration, ADA ramp upgrades, and new bike lanes. Flaggers will assist motorists in the work zones.
  • Spruce Ave. at 27th St. (through October 2019): Sections of Spruce Ave. near the intersection are closed for replacement of a water main. Signs are posted to assist motorists.
  • Windsor Ave. between 36th St. and 29th St. (through February 2020) are closed to through traffic. Resident traffic and deliveries only.
  • Clematis Streetscape road closures (All pedestrian walkways to restaurants and businesses remain open):
    • 100 block of N. Clematis St. (through December 2019)
    • 200 block of Clematis St. (through October 2019)
EVENTS ROAD CLOSURES
  • Clematis by Night produced by CWPB Community Events (Thursday, September 26, 2019, 6:00 p.m. - 10:00 p.m.): N. Clematis & S. Clematis St. closed between Narcissus Ave. and Flagler Dr. 
  • Respectable Street Anniversary Party produced by Subculture Group/Respectable Street (Saturday, September 21, 2019, 8:00 a.m. through Sunday, September 22, 2019, 4:00 a.m.) Full road closure for 500 block of Clematis St.  
 
PRIVATE ROAD CLOSURES
ROSEMARY SQUARE STREETSCAPE (CITYPLACE)
  • Rosemary Ave. between Hibiscus St. and Fern St. (through Saturday, November 16, 2019): Rosemary will be closed to vehicular traffic. Pedestrian access will be maintained.
  • Gardenia Ave. between S. Rosemary Ave. and FEC Railway (until further notice): Road closed as part of the Rosemary Square renovation. Deliveries allowed only.
  • For more information: http://www.cityplace.com/rosemarysquare/
PALM BEACH ATLANTIC UNIVERSITY
  • Pembroke Pl. between S. Olive Ave. & S. Dixie Hwy. (through June 2020): Eastbound traffic only on Pembroke Pl. for construction of a new dormitory. Flaggers will assist motorists in the work zone.
PALM BEACH COUNTY (PBC) ENGINEERING & PUBLIC WORKS ROAD CLOSURES IN CITY OF WPB
  • Community Dr. approximately 860 feet east of Military Tr. (until further notice): Eastbound right turn lane closure for the installation of a driveway connection.
  • N. Congress Ave. approximately 20 feet south of Executive Center Dr. to approximately 690 feet south of Palm Beach Lakes Blvd. (until further notice): Periodic nighttime northbound lane closures for FPL pole replacement.
  • Roebuck Rd. from Jog Rd. to Haverhill Rd. (until further notice): Periodic lane closures with flaggers controlling traffic for road construction. 
FLORIDA DEPT OF TRANSPORTATION (FDOT) ROAD CLOSURES IN CITY OF WPB
  • Okeechobee Blvd., between Suwanee Dr. and Chillingworth Dr. (Monday, September 16, 2019, through Friday, September 27, 2019) will have the westbound outside lane closed, 9:00 a.m. until 3:30 p.m., Monday through Friday, for utility work.
  • Okeechobee Blvd. at Sapodilla Ave. from Parker Ave. to Rosemary Ave. (through Friday, Oct.4, 2019) will have one outside lane closed in each direction, 9:00 a.m. until 3:30 p.m., Monday through Friday, for modifications to the intersection as part of the Kravis Center renovation.
  • Northbound and southbound N. Military Tr. between Upthegrove Lane and 45th St. (Wednesday, Sept. 25 through Tuesday, Nov. 19, 2019): 2 of 3 lanes closed, 9:00 a.m. until 4:00 a.m., Monday through Friday, for replacement wood poles with concrete poles and install hardware with transfer lines
  • For more information, contact FDOT: (866) 336-8435 or http://www.fdot.gov/.
 