Road and Dock for Thursday, February 27, 2025

Published on February 26, 2025

Road and Dock barrier logo

City Logo with News Release tag

CITY OF WEST PALM BEACH ENGINEERING, PUBLIC WORKS & UTILITY ROAD CLOSURES 

  • Flagler Drive Sidewalk Closure (through March 2025): Sidewalk closed between 4601 to 4901 South Flagler Drive.

  • 36th Street Sanitary Sewer and Drainage Rehab (through February 2025): Intermittent lane closures with flagging operations for underground work.

  • Georgia Avenue Sanitary Sewer and Stormwater Rehabilitation (through August 2025): Intermittent lanes closures for storm and sanitary sewer investigation.

  • Wildermere Drainage Project (through March 2025): Single-lane closure on Wildermere Road between South Olive Avenue and South Dixie Highway. Anticipated start the week of February 24, 2025.

  • Washington Road (through March 2025): Intermittent lane closures on Washington Road between Monceaux Road and Edgewood Drive for lighting installation. Anticipated start date March 3, 2025.

  • 7th Street between Palm Beach Lakes and Australian Avenue (March 2025) Intermittent lane closures to install speed humps.

  • Carver neighborhood Improvements – Windsor Avenue from 10th Street to 11th Street.  Lane closures from February 24th to mid-March 2025.

EVENT ROAD CLOSURES   

  • Clematis by Night – Thursday, February 27 & Thursday, March 06: Note the following road closures will be in place:

  • City Place Closure – Friday, February 28 through Sunday, March 2 & Friday, March 7 through Sunday, March 9: Rosemary Avenue between Okeechobee Boulevard and Hibiscus Street.

  • GreenMarket – Saturday, March 1 & Saturday, March 8 – Note the following road closures will be in place:

  • West Palm Beach Antique, Flea and Craft Market – Saturday, March 1 & Saturday, March 8 - Note the following road closures will be in place:

  • Boat Show (through April 4, 2025)

    • Hard closure on Evernia Street between Tamarind Avenue and Sapodilla Avenue for staging.

    • Road Closures:                                                                                       

    • Flagler Drive northbound only - Lakeview Avenue to Fern Street on March 3, 2025, from 7 a.m. to 6 p.m.

    • Flagler Drive northbound only – Lakeview Avenue to Fern Street on March 4, 2025, from 7 a.m. tp 6 p.m.

    • Flagler Drive northbound only - Lakeview Avenue to Banyan Boulevard from March 5, 2025, at 6 a.m. to March 15, 2025, at 3 p.m.

    • Flagler Drive northbound & southbound - Lakeview Avenue to Banyan Boulevard from March 15, 2025, at 3 p.m. to March 26, 2025, at 6 p.m.

    • Flagler Drive northbound only - Lakeview Avenue to Banyan Boulevard from March 26, 2025, at 6 p.m. to March 28, 2025, at 6 p.m.

    • Flagler Drive northbound only - Lakeview Avenue to Fern Street from March 28, 2025, at 6 p.m. to March 31, 2025, at 6 p.m.

    • Lantana Avenue – Banyan Boulevard to North Clematis from March 15, 2025, at 3 p.m. to March 26, 2025, at 6 p.m.

    • North Clematis Street - Narcissus Avenue to Flagler Drive. from March 15, 2025, at 3 p.m. to March 26, 2025, at 6 p.m.

    • South Clematis Street to Flagler Drive. from March 15, 2025, at 3 p.m. to March 26, 2025, at 6 p.m.

    • Datura Street - Narcissus Avenue to Flagler Drive from March 15, 2025, at 3 p.m. to March 26, 2025, at 6 p.m.

    • Evernia Street - Narcissus Avenue to Flagler Drive. from March 15, 2025, at 3 p.m. to March 26, 2025, at 6 p.m.  

    • Fern Street – South Olive Avenue to Flagler Drive from March 15, 2025, at 3 p.m. to March 26, 2025, at 6 p.m.  

    • Clematis Street – South Olive Avenue to Narcissus Avenue from March 19, 2025, at 7 a.m. to March 23, 2025, at 6 p.m.

    • Datura Street – South Olive Avenue to Narcissus Avenue – Limited Entry from March 19, 2025, at 7 a.m. to March 23, 2025, at 6 p.m.

    • Evernia Street – South Olive Avenue to Narcissus Avenue – One-way traffic going west from March 19, 2025, at 7 a.m. to March 23, 2025, at 6 p.m.

  • March to End Homelessness – Friday, February 28, 2025 – Note the following road closures will be in place:

    • Noon to 8 p.m.

      • North Clematis Street and South Clematis Street

  • Autism Speaks WPB Walk/Field Day – Sunday, March 2, 2025 – Note the following road closures will be in place:

    • 7 a.m. to 12:30 p.m.

      • Flagler Drive from Lakeview Avenue to Banyan Boulevard

    • 10 a.m. to noon

      • Flagler Drive from Banyan Boulevard to 5th Street

  • CWPB Health and Benefits Fair – Wednesday, March 5, 2025 - Note the following road closures will be in place:

    • 7 a.m. to 2 p.m.

      • Southbound Flagler Drive from Banyan Boulevard to Datura Street

      • South Clematis between Narcissus Avenue & Flagler Drive

 

PRIVATE PROJECT ROAD CLOSURES

  • 512 Clematis (through May 2025): Sidewalk closure on southwest corner of Clematis Street & Quadrille Plaza Drive.

  • Olara Boat Dock (through January 2028): All lanes are currently open.

  • Flagler Forte (through May 2025):

  • PBAU (through March 2025): No road closures. Sidewalk closure along the frontage of the project.

  • South Flagler House (through December 2026): Diana Place between South Olive Avenue and South Flagler Drive. Sidewalk closure along the frontage of the project.

  • The District (through Fall 2026):

    • Hard closure on 23rd Street between Pinewood Avenue and Broadway Avenue.
    • Hard closure on Broadway Avenue between Northwood Road and 23rd Street.


  • NORA (through spring 2025) - Hard closure on North Railroad Avenue between 7th and 11th Streets for utility installation.

  • NORA Hotel (through fall 2026) – No closures are currently in place.

  • NYU (through December 2025) – Eastbound Datura Street between South Dixie Highway and South Olive Avenue closed Monday – Friday during the duration of the project.

  • CityPlace East/West Towers (through Summer 2025): Hard closure on Gardenia Street between Rosemary Avenue & Quadrille Boulevard.

  • 719 Sapodilla Avenue – No road closures at this time.

  • 115 S Olive Avenue (summer 2025): Sidewalk closures between Datura Street and Clematis Street on South Olive Avenue.

FRANCHISE UTILITY ROAD CLOSURES

  • FPL – Hard closure on 3rd Street between Rosemary Avenue & Quadrille Boulevard until further notice.

  • FPL - Intermittent lane and sidewalk closures on Tamarind Avenue between 22nd  Street and 21st Street and on Lincoln Road between North Tamarind Avenue and Windsor Avenue, through March 7, 2025.

  • FPL - Intermittent lane and sidewalk closures on North Shore Drive between 39th  Street and 43rd Street, through March 7, 2025.

  • FPL - Georgia Avenue South of Forest Hill Boulevard - Intermittent lane and sidewalk closures from through Friday, February 28, 2025.

PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS ROAD CLOSURES IN THE CITY

  • North Australian Avenue just north of Mangonia Drive: Periodic northbound right lane closure for pole installation.

  • Northlake Boulevard at Ibis Boulevard and at Shoppes of Ibis (until further notice): Periodic eastbound right lane closure for Mast arm installation.

  • For more information about PBC road closures, contact PBC Engineering & Public Works at (561) 684-4000 or visit the Road & Bridge Construction List

FLORIDA DEPT. OF TRANSPORTATION (FDOT) ROAD CLOSURES IN THE CITY OF WPB 

State Road (SR) 710/Beeline Highway Reconstruction Project (through late 2029)

  • Project Limits: 3.142-mile project in the cities of Palm Beach Gardens, Riviera Beach and West Palm Beach began on March 18, 2024.

  • Improvements consist of widening SR 710/Beeline Highway from Northlake Boulevard to SR 708/Blue Heron Boulevard from 4 lanes to 6 lanes, replacing and widening the Florida’s Turnpike bridge over SR 710/Beeline Highway, constructing an at-grade partial Continuous Flow Intersection (CFI) at the intersection of SR 710/Beeline Highway and Northlake Boulevard, adding sidewalks and bicycle lanes on both sides of SR 710/Beeline Highway, upgrading railroad crossings, drainage, signage, lighting, signalization and pavement markings throughout project limits, and upgrading Intelligent Transportation System (ITS).

  • State Road (SR) 710/Beeline Highway from SR 708/Blue Heron to Northlake Boulevard will have one inside lane closed in each direction, daily, 7 a.m. until 6 p.m., Monday through Friday.

  • SR 710/Beeline Highway and Northlake Boulevard will have one inside lane closed in each direction, daily, 10 a.m. until 5 p.m., Monday through Friday.

  • SR 710/Beeline Highway and Jog Road will have one inside lane closed in each direction, daily, 10 a.m. until 6 p.m., Monday through Friday.

  • SR 710/Beeline Highway and Haverhill Road will have one inside lane closed in each direction, daily, 7 a.m. until 6 p.m., Monday through Friday.

  • SR 710/Beeline Highway from Military Trail to Blue Heron Boulevard will have one lane closed in each direction, daily, 7 a.m. until 6 p.m., Monday through Friday.

  • SR 710/Beeline Highway lane widths are reduced and westbound traffic has been shifted to the median from just east of the Turnpike to Blue Heron Boulevard to safely facilitate construction activities.

  • The SR 710/Beeline Highway northwest ramp to eastbound Northlake Boulevard has been temporarily closed to safely facilitate this phase of construction and is anticipated to reopen in Fall 2025. During this closure, motorists can continue on SR 710/Beeline Highway and turn right at the light to access eastbound Northlake Boulevard.

     

    Northshore Bridge Improvements Project (spring 2025)

  • Project Limits: This 0.07-mile project on North Shore Drive over the Carver Canal in the City of West Palm Beach began August 26, 2024.

  • The work includes construction of a prefabricated steel pedestrian bridge on the west side of North Shore Drive crossing the Carver Canal, realignment of the pedestrian sidewalk path on the west side of North Shore Bridge to the new pedestrian bridge, reconstruction of drainage outfalls along the north and south sides of the newly constructed pedestrian bridge, replacement and upgrading signage impacted by construction, and adding lighting at each side of the new pedestrian bridge.

  • The southbound lane of North Shore Drive will be intermittently closed from Monday through Friday for material delivery and drainage installation operations. Flaggers will be on-site to assist motorists, and pedestrian detours will be in place.

    Intersection Lighting Retrofit Improvements Project

  • Project Limits: This lighting improvements project at 22 different intersections within cities in Palm Beach, Martin, and St. Lucie Counties is anticipated to begin December 9, 2024. Improvements include creating a safer, more energy-efficient, and resilient transportation environment by upgrading lighting to LED fixtures and retrofitting existing light poles.

  • SR 882/Forest Hill Boulevard from Jog Road to SR 805/Dixie Highway in West Palm Beach will have intermittent single-lane closures from 6:30 p.m. until 3:30 p.m., excluding peak hours and school speed zone hours, Tuesday through Friday, for lighting fixture replacement activities.

  CITY OF WEST PALM BEACH DOCKS

  • Currie Park Boat Docks and Ramps (2400 North Flagler Drive): Ramps are open daily, from sunrise to sunset.

  • Lake Mangonia Park Boat Ramps (2957 North Australian Avenue): Ramps are open daily, from sunrise to sunset. 

  • Clematis Street Docks (South Clematis Street at South Flagler Drive): Docks are open daily, from 5 a.m. until midnight. Dock will be closed from March 3, 2025, through March 31, 2025.

  • Fern Street Dock (Fern Street at South Flagler Drive): The dock is open daily from 5 a.m. until midnight. No overnight dockage is allowed for boats, dinghies, or kayaks. The Fern Dock is also the home of a West Palm Beach Marine Patrol Boat and the West Palm Beach Fire and Rescue Boat. Dock will be closed from March 3, 2025, through March 31, 2025.

Tagged as: