Road and Dock for Thursday, June 4, 2026

Published on June 03, 2026

City of West Palm Beach logo   Road and Dock barrier logo

CITY OF WEST PALM BEACH ENGINEERING, PUBLIC WORKS & UTILITY ROAD CLOSURES 

  • Currie Park (through spring 2027):
    • Sidewalk closure on east side of Flagler Drive in front of Currie Park
  • Chase Street & Trinity Place Streetscape (through summer 2026):
    • Chase Street closed between Trinity Place and Tanglewood Court. Intersection of Tanglewood Court & Trinity Place remains open to through traffic.
    • Trinity Place closed between South Olive Avenue & Chase Street. Road remains open for local traffic only.
  • Northmore Neighborhood Sidewalk Improvements (through summer 2026):
    • Intermittent lane closure with flagging operations.
  • Clematis Garage Repair (500 Banyan Boulevard) (through June 2026)
    • Clematis Garage exits/entrances are accessible. Expect delays and limited parking spaces.
  • City Center Garage Repair (401 Clematis Street) (through June 2026)
    • City Center Garage exits/entrances remain accessible. Expect delays and limited parking spaces.
  • North Flagler Drive Utility Improvements (early 2027)
    • Full closure on Flagler Drive between 33rd Street and 34th Street. Follow posted detours.
  • Tidal Valves Project (summer 2026)
    • Flagler Drive and 9th Street will be closed through Friday, June 12.
  • Bethesda Terrace Utility Work
    • Bethesda Terrace closed from Dixie Highway to Flagler Drive until June 12, 2026.
  • 36th Street from Windsor Avenue to Westview Avenue:
    • Intermittent lane closures for repaving from June 8 to June 12, 2026. 
  • 48th Street Utilities Replacements:
    • One lane closure on 48th Street west of Broadway until October 30, 2026. Two-way traffic will be maintained with flagman.
  • Datura Street Sidewalk Repairs between Rosemary Avenue and Quadrille Plaza Drive:
    • Intermittent sidewalk closures until Friday, June 5, 2026.
  • Quadrille Plaza Drive Sidewalk Repairs between Clematis Street and Datura Street and Quadrille Plaza Drive:
    • Intermittent sidewalk closures until Friday, July 3, 2026.
  • 5th Street Milling and Resurfacing from North Dixie Highway to North Flagler Drive
    • Intermittent lane closures with flagging operations until Friday, June 5, 2026.

BRIGHTLINE RAILROAD CROSSING UPGRADES

  • Full closure at Brightline tracks for railroad crossing upgrades.  Tentative schedule may shift one street north or south.  No adjacent streets will be closed concurrently.
    • El Vedado on Thursday, June 4
    • Monroe Drive on Friday, June 5
    • Roseland Drive on Monday, June 8
    • Nottingham Boulevard on Tuesday, June 9
    • Bunker Road on Wednesday, June 10
    • Hunter Street on Thursday, June 11
    • Gregory Road on Friday, June 12

EVENT ROAD CLOSURES   

  • Clematis by Night –Thursday, June 4: Note the following road closures will be in place:
    • Thursdays 1:30 p.m. to 10 p.m.:
      • North & South Clematis Streets between Narcissus Avenue and Flagler Drive
      • Lantana Avenue between Banyan Boulevard and North Clematis Street
  • Alan Jackson’s 5 O’Clock Somewhere Festival–Closures in effect from Saturday, June 6 through Wednesday June 17:
    • Flagler Drive from Fern Street to Banyan Boulevard
    • 100 Blocks of North and South Clematis Streets.
    • 100 Block of Evernia Street
    • 100 Block of Datura Street

 

The following roadways will be subject to closure during the event at the discretion of the West Palm Beach Police:

  • Lantana Avenue between Banyan Boulevard and North Clematis Street
  • Narcissus Avenue between Banyan Boulevard and Datura Street
  • 200 Block of Clematis Street

PRIVATE PROJECT ROAD CLOSURES

  • Full Closure on Lakeview Avenue between South Olive Avenue and Chase Street Tuesday, June 9 at 9 p.m. until Wednesday, June 10 at 4 a.m.
    • Crane needed for AC replacement at Hyatt Place.
  • Olara Boat Dock (through January 2028): No closures.
  • Olara:
    • Butler Street from Ponce De Leon Avenue to Flagler Drive closed through June 12, 2026, for utility work
  • Ritz Carlton (through late 2027):
    • Right southbound lane of North Flagler Drive closed between Pine Street and North Lakeside Court until further notice
  • Shorecrest (through late 2027)
    • Right southbound lane of North Flagler Drive closed between Pine Street and North Lakeside Court until further notice.
  • PBAU Parking Garage & Residence Tower (through summer 2027)
    • Full closure on Gruber Place from South Dixie Highway to Wallingford Place until further notice including sidewalk
    • Full closure on Wallingford from Gruber Place to Acacia Road until further notice in sidewalk.
    • Full closure on Acacia Road from South Dixie Highway to South Olive Avenue until July 10, 2026.
  • South Flagler House (through December 2026):
    • Southbound Flagler Drive lane closure at Diana Place for utility work, two-way traffic maintained, through Friday, June 5, 2026.
    • Diana Place is closed between South Olive Avenue and South Flagler Drive
    • Sidewalk closure along the frontage of the project
  • The District (through fall 2026):
    • Full closure on 23rd Street between Pinewood Avenue and Broadway Avenue until further notice
    • Southbound lane of Broadway Avenue between 24th Street and 25th Street will be closed from Monday, June 15, 2026 until further notice
  • NORA Hotel (through fall 2026):
    • No active roadway closures
  • NYU (through the end of 2026):
    • Eastbound Datura Street between South Dixie Highway and South Olive Avenue closed during the duration of the project
    • Parking stalls are not accessible along South Dixie Highway
    • Sidewalk closure between Datura Street and Evernia Street
  • Square One East/West Towers (through late 2026):
    • Full closure on Gardenia Street between Rosemary Avenue & Quadrille Boulevard
  • Kirksey Commons (through early 2027)
    • 15th Street closed between Spruce Avenue and North Dixie Highway until further notice
    • 14th Street closed between Spruce Avenue and North Dixie Highway until further notice
  • Alba (summer 2026):
    • Intermittent flagging operation for material deliveries
  • West Palm Pointe (spring 2028):
    • No road closures.
    • Intermittent flagging operation on Lakeview Avenue
  • 320 Lakeview (Mr. Cs Residence) (through fall 2027):
    • Intermittent flagging operation on Lakeview Avenue
  • 8111 South Dixie Highway (through spring 2027)
    • No closures at the moment
    • Partial sidewalk closure on Gregory Road along project frontage
  • Soleste (through late 2026):
    • Intersection of 3rd Street and Rosemary Avenue closed from June 4 to June 9, 2026
  • One West Palm:
    • 4th Street from Quadrille to Dixie Highway closed from Wednesday, June 10 to Monday, June 15, 2026.

FRANCHISE UTILITY ROAD CLOSURES

  • FPL - Intermittent lane and sidewalk closures for overhead to underground conversion project through June 2026. Streets/blocks affected:        
    • 400 - Winters Street
    • 400 - Wilder Street
    • 400 - Forest Hill Boulevard
    • 400 - Lytle Street
    • 400 - Macy Street
    • 400 - Hunter Street
    • 500 - Franklin Road
    • 500 - Nathan Hale Road

 

  • FPL - Intermittent lane and sidewalk closures for overhead to underground conversion project through June 2026. Streets/blocks affected:        
    • 300 - Nathan Hale Road
    • 100-200 Bloomfield Drive
    • 300 Colonial Road
    • 100-200 Santa Lucia Drive                                         
    • 300 Valley Force Road
    • 100-200 Elwa Place
    • 100-300 - Palmetto Lane
    • 100-300 - Churchill Road
    • Brevard Avenue between Palmetto Street and Franklin Road
    • Martin Avenue between Palmetto Street and Franklin Road
    • South Olive Avenue between Churchill Road and Franklin Road
    • Washington Road between Elwa Place and Cortez Road
    • South Flagler Drive between Churchill Road and Cortez Road

 

  • FPU - Southside WPB Natural Gas Main replacement project. Intermittent lane closures on the following streets/blocks through June 2026:
    • 200 - Gray Street
    • 200 - Ashworth Street
    • 100 - Alpine Road
    • 100 - 200 - Beverly Road
    • 100 - 200 - Costello Road
    • 100 - 200 - Desota Road
    • 100 - 200 - Miramar Way
    • 100 - 200 - Summa Street
    • 100 - 200 - Seville Road
    • 100 - 200 - Alhambra Place
    • 100 - 200 - Rutland Boulevard
    • 100 - 200 - Gregory Place
    • 100 - 200 - Gregory Road
    • 100 - 200 - Arlington Road
    • 100 - Arlington Place
    • 6500 - 7900 - Washington Road
    • 8000 - Flagler Court
    • 6800 - 8000 - South Flagler Drive
  • FPL - Intermittent lane and sidewalk closures for overhead to underground conversion project through June 2026. Streets/blocks affected:
    • Flagler Promenade South
    • Worth Court
    • Worth Court North
    • Worth Court South
    • 100-300 Block of Edmor Road
    • 200-300 Block of Rilyn Drive
    • 100-300 Block of Russlyn Drive
    • 100-300 Block of Murray Road
    • 4300-4800 South Dixie Highway
    • 4300-4800 South Olive Avenue
    • 4100-4400 Washington Road
    • 4800 McKenna Lane
    • 4100-4900 South Flagler Drive

     

     

  • FPL Norton phase 8 -Intermittent lane and sidewalk closures for overhead to underground conversion project through June 2026. Streets/blocks affected:
    • 400 Block of Maddock Street
    • 400 Block of Barnett Street
    • 400 Block of Kern Street
    • 6900 - 7200 Block of Norton Avenue

     

     

  • Verizon Wireless - Intermittent lane closures from through Friday June 5, 2026
    • Banyan Boulevard between North Dixie Highway and North Quadrille Boulevard
    • North Dixie Highway from North Quadrille Boulevard to Datura Street
  • AT&T - Intermittent lane closures on 36th Street between Australian Avenue and 36th Court. through Friday, June 12, 2026.
  • AT&T - Intermittent lane closures on 36th Street between Australian Avenue and 36th Court. through Friday, June 12, 2026.
  • IKE Smart kiosk - Intermittent lane and sidewalk closures on North Dixie Highway between Banyan Boulevard and Clematis Street from Monday, June 15 to June 26, 2026.
  • Crown Castle - Intermittent lane and sidewalk closures through Friday, June 12, 2026
  • Village Boulevard between Olympic Place and Brandywine Road.
  • Olympic Place between Village Boulevard and Columbia Drive.
  • Columbia Drive between Olympic Place and Harvard Circle. 

PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS ROAD CLOSURES IN THE CITY

  • South Australian Avenue south of Mercer Avenue and Old Okeechobee Road: Periodic nighttime double northbound right lane closures. Northbound right turn lane closure for drainage installation.
  • South Australian Avenue from I-95 to Okeechobee Boulevard: Periodic Lane closures for drainage installation.
  • Belvedere Road from Skees Road to east of North Cleary Road: East and west bound lane closures.
  • For more information about PBC road closures, contact PBC Engineering & Public Works at (561) 684-4000 or visit the Road & Bridge Construction List

FLORIDA DEPT. OF TRANSPORTATION (FDOT) ROAD CLOSURES IN THE CITY OF WPB 

State Road (SR) 710/Beeline Highway Reconstruction Project (through late 2029)

  • Project Limits: 3.142-mile project in the cities of Palm Beach Gardens, Riviera Beach and West Palm Beach began on March 18, 2024.
  • Improvements consist of widening SR 710/Beeline Highway from Northlake Boulevard to SR 708/Blue Heron Boulevard from 4 lanes to 6 lanes, replacing and widening the Florida’s Turnpike bridge over SR 710/Beeline Highway, constructing an at-grade partial Continuous Flow Intersection (CFI) at the intersection of SR 710/Beeline Highway and Northlake Boulevard, adding sidewalks and bicycle lanes on both sides of SR 710/Beeline Highway, upgrading railroad crossings, drainage, signage, lighting, signalization and pavement markings throughout project limits, and upgrading Intelligent Transportation System (ITS).
    • S.R. 710/Beeline Highway lanes from S.R. 809/Military Trail to S.R. 708/Blue Heron Boulevard will be reduced to one inside lane through May 2026. 
    • S.R. 710/Beeline Highway from S.R. 708/Blue Heron to Northlake Boulevard will have one inside lane closed in each direction daily, 7 a.m. until 6 p.m., Monday through Friday.
    • S.R. 710/Beeline Highway and Northlake Boulevard will have one inside lane closed in each direction daily, 10 a.m. until 5 p.m., Monday through Friday.
    • S.R. 710/Beeline Highway and Jog Road will have one inside lane closed in each direction daily, 10 a.m. until 6 p.m., Monday through Friday.
    • S.R. 710/Beeline Highway and Haverhill Road will have one inside lane closed in each direction daily, 7 a.m. until 6 p.m., Monday through Friday.
    • S.R. 710/Beeline Highway from Military Trail to Blue Heron Boulevard will have one lane closed in each direction daily, 7 a.m. until 6 p.m., Monday through Friday.
    • S.R. 710/Beeline Highway lane widths are reduced, and westbound traffic has been shifted to the median from just east of the Turnpike to Blue Heron Boulevard to safely facilitate construction activities.
    • S.R. 710/Beeline Highway will have one southeast-bound lane closed daily, from 9 a.m. until 6 p.m., Monday through Friday.
    • S.R. 710/Beeline Highway from south of Haverhill Road to north of Jog Road will have one outside southeast-bound lane closed from 8 p.m. until 6 a.m., Sunday through Thursday, to safely facilitate demolition activities.
    • The S.R. 710/Beeline Highway northwest ramp to eastbound Northlake Boulevard has been temporarily closed to safely facilitate this phase of construction and is anticipated to reopen in Spring 2026. During this closure, motorists can continue on S.R. 710/Beeline Highway and turn right at the light to access eastbound Northlake Boulevard.
    • The southeast S.R. 710/Beeline Highway left turn lane to eastbound S.R. 708/Blue Heron Boulevard will be closed around-the-clock through September 2026.

     

    Detour:

    • Motorists traveling to eastbound S.R, 708/Blue Heron Boulevard will be detoured via southeast S.R. 710/Beeline Highway, north on S.R. 809/Military Trail, and east on S.R. 708/Blue Heron Boulevard.
    • Access for emergency and first responder vehicles will be maintained following the detour route.  Signage will be posted along the detour route to assist motorists.
    • Access to all businesses on S.R. 708/Blue Heron Boulevard will remain open during this work.

       

    S.R. 5/U.S. 1 Resurfacing, Restoration, and Rehabilitation Project (through early 2027)

  • Project Limits: This 1.044-mile project on S.R. 5/U.S. 1 from Belvedere Road to south of Okeechobee Boulevard in the city of West Palm Beach began in April 2026. Project Improvements consist of minor reconstruction, and milling and resurfacing the roadway throughout the project limits of S.R. 5/U.S. 1 from Belvedere Road to south of S.R. 704/Okeechobee Boulevard to enhance infrastructure resilience and safety for the community; reconstructing curb ramps to meet ADA criteria and replacing portions of the existing sidewalk to improve pedestrian safety, connectivity, and use; upgrading signing and pavement markings to enhance visibility and safety; replacing drainage structures within driveways; adding a new signalized mid-block crosswalk north of Vallette Way; upgrading pedestrian signalization at Belvedere Road and Flamingo Drive and the crosswalk north of Cranesnest Way; installing overhead flashing beacons within the school zone north and south of Flamingo Drive; and upgrading lighting to LED fixtures and installing a new light at Flamingo Drive.
  • Northbound and southbound S.R. 5/U.S.1 may have one lane closed intermittently from Belvedere Road to S.R. 704/Okeechobee Boulevard, 9 a.m. to 3 p.m., through Friday, June 5, 2026, for concrete work.

 

  CITY OF WEST PALM BEACH DOCKS

  • Currie Park Boat Docks and Ramps (2400 North Flagler Drive): Ramps are closed until spring 2027.
  • Lake Mangonia Park Boat Ramps (2957 North Australian Avenue): Ramps are open daily, from sunrise to sunset. 
  • Clematis Street Dock (South Clematis Street at South Flagler Drive): Dock are open daily, from 5 a.m. until midnight.  Clematis Street Dock will be closed starting Saturday, June 6th to Wednesday, June 17th for the Alan Jackson’s 5 O’Clock Somewhere Music Festival.
  • Fern Street Dock (Fern Street at South Flagler Drive): The dock is open daily from 5 a.m. until midnight. No overnight dockage is allowed for boats, dinghies, or kayaks. The Fern Dock is also the home of a West Palm Beach Marine Patrol Boat and the West Palm Beach Fire and Rescue Boat.

 

Tagged as: