Dixie Highway Lane Repurposing Study
From 25th Street to Quadrille Boulevard
Thank you for participating in the study process. The link below is the full Concept Report submitted to Florida Department of Transportation by the TPA.
Concept Report(PDF, 18MB)
In Summary:
The report recommended changes along US-1 North Dixie Highway to make it safer and easier for everyone—whether you’re walking, biking, riding transit, or driving.
The recommended changes build on the US-1 Multimodal Corridor Study, a 42-mile plan from Boca Raton to Jupiter that was approved in 2018, by the TPA governing board. The 2018 study found the need for:
- Better Bus Service
- Safer Sidewalks and Bike Lanes
- Stronger Connections Between Neighborhoods and Destinations
The 2018 study also showed that the West Palm Beach section of US-1 is one of the most dangerous areas for people walking or biking in the entire corridor.
What is recommended:
Today, US-1 between Quadrille Boulevard and 25th Street is a 4-lane road without bike lanes. Sidewalks exist on both sides but vary in width and separation from the street.
The proposed change would:
- Reduce the road from four lanes to one lane in each direction with a center turn lane.
- Add buffered bike lanes for safer riding.
- Add street trees for shade and comfort.
- Improve space for safer pedestrian crossings
Why Reduce Lanes?
National research shows that changing a four-lane road to three lanes with bike lanes can:
- Reduce crashes for drivers, cyclists, and pedestrians.
- Make it easier and safer to cross the street.
- Provide room for new walking and biking facilities without buying more land.
Traffic Impacts
Traffic studies looked at what might happen in the future if lanes were reduced:
- Some drivers (about 32%) would choose nearby roads, mainly Flagler Drive
- Most intersections would still work well after changes-especially with traffic signal timing adjustments to keep traffic moving
Bottom Line
This project is about saving lives, making walking and biking safer, and improving comfort along US-1. While travel patterns may shift, the street would better serve everyone, based on the prioritization of safety.

Thank you for attending Part 2 of the two-part workshop series and providing valuable feedback!






On December 5, we held the second of two community engagement events to reimagine what a safe and welcoming US 1 would look like in the City of West Palm Beach. Participants had the opportunity to see how their values, identified in the first meeting, translated into roadway concepts that serve the purpose of moving people, creating local economic opportunities and most importantly, keeping people safe.
Download part 2 of the US1-N Dixie Hwy Public Meeting presentation here(PDF, 11MB)
Project Background & Description
The Dixie Highway Lane Repurposing Project is an outcome of the US-1 Multimodal Corridor Study, a 42-mile, collaborative plan that established a vision for multimodal infrastructure along US-1 corridor throughout Palm Beach County. The US-1 Multimodal Corridor Study was approved by the Palm Beach Transportation Planning Agency (TPA) Governing Board in May 2018.
For more information please see the Dixie Highway Lane Repurposing Study Fact Sheet(PDF, 2MB)
Contact details
Jessica A. Keller, ENV SP
(561) 917-4317