Road and Dock for Thursday, January 15, 2026

Published on January 14, 2026

News Release logo  Road and Dock barrier logo

CITY OF WEST PALM BEACH ENGINEERING, PUBLIC WORKS & UTILITY ROAD CLOSURES 

  • Currie Park (through spring 2027):
    • Sidewalk closure along project frontage
  • 26th St Utility Improvement Project (summer 2026):
    • No closures at the moment.
  • Chase Street & Trinity Place Streetscape (through summer 2026):
    • Chase Street closed between Lakeview Avenue and Okeechobee Boulevard
  • Northmore Neighborhood Sidewalk Improvements (through summer 2026):
    • Intermittent Lane closure with flagging operations.
  • Clematis Garage Repair, 500 Banyan Boulevard (through May 2026)
    • Clematis Garage Exits/Entrances remain accessible. Expect delays and limited parking spaces. Roof is open for parking.
  • Banyan Garage, 200 Banyan Boulevard (through February 2026)
    • Banyan Garage Exits/Entrances remain accessible. Expect delays and limited parking spaces.
  • North Flagler Drive Utility Improvements (early 2027)
    • No closures.
  • Tidal Valves Project (summer 2026)
    • No closures.

EVENT ROAD CLOSURES   

  • Clematis by Night – Thursday, January 15 & Thursday, January 22: Note the following road closures will be in place:
    • Thursdays 1:30 p.m. to 10 p.m.:
      • North & South Clematis Streets between Narcissus Avenue and Flagler Drive
      • Lantana Avenue between Banyan Boulevard and North Clematis Street
      • Narcissus Avenue between Dramaworks Alley & North Clematis Street
      • Flagler Drive between Banyan Boulevard and Datura Street
    • Thursdays 5 p.m. to 9 p.m.
      • Flagler Drive between Banyan Boulevard & Datura Street.
  • GreenMarket – Saturday, January 17 & Saturday, January 24 – Note the following road closures will be in place:
    • Saturdays 5 a.m. to 3:30 p.m.:
      • 100 blocks of North and South Clematis Streets.
      • Lantana Avenue between Banyan Boulevard and North Clematis Street
      • 200 – 400 block of Clematis Street.
    • Saturdays 7:15 a.m. to 2:15 p.m.
      • South Dixie Highway between Banyan Boulevard and Datura Street
      • South Olive Avenue between Banyan Boulevard and Datura Street
      • Flagler Drive between Banyan Boulevard and Datura Street
      • Narcissus Avenue between Banyan Boulevard and Datura Street
  • West Palm Beach Antique, Flea and Craft Market – Saturday, January 17 & Saturday, January 24 - Note the following road closures will be in place:
    • Saturdays 5 a.m. to 3:30 p.m.
      • 100 blocks of North and South Clematis Streets.
      • Lantana Avenue between Banyan Boulevard and North Clematis Street
      • 200 – 400 block of Clematis Street
    • Saturdays 7:30 a.m. to 2:15 p.m.
      • South Dixie Highway between Banyan Boulevard and Datura Street
      • South Olive Avenue between Banyan Boulevard and Datura Street
      • Flagler Drive between Banyan Boulevard and Datura Street
  • The Norton Gala –January 23, 2026 – February 13, 2026 – Note the following road closures:
    • January 23 through February 13 – Preparation for Gala
      • Jefferson Road closed between Olive Avenue and Dixie Highway
    • February 7 – The Norton Gala 2026 – noon to 11:30 pm
      • Chadbourne Court Between South Olive Avenue and South Flagler Drive
      • South Olive Avenue Between Chadbourne Court & Cranesnest Way
      • Actaeon Place between South Olive & South Flagler Drive
      • Cranesnest Way Between South Olive and South Dixie Highway

PRIVATE PROJECT ROAD CLOSURES

  • Olara Boat Dock (through January 2028): No closures.
  • PBAU Business School (through March 2026): No road closures. Sidewalk closure along the frontage of the project.
  • PBAU Parking Garage & Residence Hall (through spring 2027):
    • No closures.
  • South Flagler House (through December 2026):
    • Diana Place is closed between South Olive Avenue and South Flagler Drive.
    • Sidewalk closure along the frontage of the project.
    • Southbound right lane closure on Flagler Drive until further notice.
    • Olive Avenue closed per the details below:
    • January 5 – January 17

    Full closure of Olive Avenue from Acacia Road to Actaeon Place

    • January 18 – January 30

    Daytime: Southbound Olive Avenue closed at Jefferson Road

    Nighttime: Full roadway closure of Olive Avenue at Jefferson Road

    • Saturday, February 7

    Olive Avenue from Jefferson Road to Actaeon Place will be closed for the Norton Gala Event

    • February 9 – February 13

    Full closure of Olive Avenue from Acacia Road to Actaeon Place

     

  • The District (through fall 2026):
    • Full closure on 23rd Street between Pinewood Avenue and Broadway Avenue until further notice.
  • The Spruce (through early 2026):
    • Sidewalk closure along the project frontage.
  • NORA Hotel (through fall 2026) – Road closed between 10th Street and 11th Street on North Railroad Avenue.
  • NYU (through late 2026) – Eastbound Datura Street between South Dixie Highway and South Olive Avenue closed during the duration of the project.
    • Parking stalls are not accessible along Dixie Highway.
    • Sidewalk closure between Datura Street and Evernia Street
  • Square One East/West Towers (through Late 2026):
    • Full closure on Gardenia Street between Rosemary Avenue & Quadrille Boulevard.
    • Daily flagging operations on Rosemary Avenue & Quadrille Boulevard for material deliveries.
  • Alba (spring 2027): Intermittent lane closures with flagging operations.
  • West Palm Pointe (spring 2028): No road closures. Sidewalk closure along Dixie Highway.
  • 8111 South Dixie Highway (through spring 2027)
    • One eastbound lane closed on Gregory Road for construction staging until further notice.
  • Soleste (through late 2026):
    • Sidewalk closure along project frontage.

    FRANCHISE UTILITY ROAD CLOSURES

  • FPL - Intermittent lane and sidewalk closures for overhead to underground conversion project through January 2026. Streets/blocks affected:        
    • 400 - Winters Street
    • 400 - Wilder Street
    • 400 - Forest Hill Boulevard
    • 400 - Lytle Street
    • 400 - Macy Street
    • 400 - Hunter Street
    • 500 - Franklin Road
    • 500 - Nathan Hale Road
  • FPL - Intermittent lane and sidewalk closures for overhead to underground conversion project through January 2026. Streets/blocks affected:        
    • 300 - Nathan Hale Road
    • 100-200 Bloomfield Drive
    • 300 Colonial Road
    • 100-200 Santa Lucia Drive                                         
    • 300 Valley Force Road
    • 100-200 Elwa Place
    • 100-300 - Palmetto Lane
    • 100-300 - Churchill Road
    • Brevard Avenue between Palmetto Street and Franklin Road
    • Martin Avenue between Palmetto Street and Franklin Road
    • South Olive Avenue between Churchill Road and Franklin Road
    • Washington Road between Elwa Place and Cortez Road
    • South Flagler Drive between Churchill Road and Cortez Road
  • FPU - Southside WPB Natural Gas Main replacement project. Intermittent lane closures on the following streets/blocks through January 2026:
    • 200 - Gray Street
    • 200 - Ashworth Street
    • 100 - Alpine Road
    • 100 - 200 - Beverly Road
    • 100 - 200 - Costello Road
    • 100 - 200 - Desota Road
    • 100 - 200 - Miramar Way
    • 100 - 200 - Summa Street
    • 100 - 200 - Seville Road
    • 100 - 200 - Alhambra Place
    • 100 - 200 - Rutland Boulevard
    • 100 - 200 - Gregory Place
    • 100 - 200 - Gregory Road
    • 100 - 200 - Arlington Road
    • 100 - Arlington Place
    • 6500 - 7900 - Washington Road
    • 8000 - Flagler Court
    • 6800 - 8000 - South Flagler Drive
  • FPL - Pole Replacement Program. Intermittent lane closures on the following streets/blocks through January 2026:
    • 1100 – 2100 Block Clare Avenue.
    • 900 - 1000 Block Caroline Street.
    • 1400 - 1800 Block Elizabeth Avenue.
    • 1000 Block Blanche Street.
    • 1200 Block Worthington Street.
    • 1200 Block Roebuck Court
    • 1400 Block Edgar Street
  • FPL - Intermittent lane and sidewalk closures for overhead to underground conversion project through January 2026. Streets/blocks affected:
    • Flagler Promenade South
    • Worth Court
    • Worth Court North
    • Worth Court South
    • 100-300 Block of Edmor Road
    • 200-300 Block of Rilyn Drive
    • 100-300 Block of Russlyn Drive
    • 100-300 Block of Murray Road
    • 4300-4800 South Dixie Highway
    • 4300-4800 South Olive Avenue
    • 4100-4400 Washington Road
    • 4800 McKenna Lane
    • 4100-4900 South Flagler Drive
  • FPL Norton phase 8 -Intermittent lane and sidewalk closures for overhead to underground conversion project through January 2026. Streets/blocks affected:
    • 400 Block of Maddock Street
    • 400 Block of Barnett Street
    • 400 Block of Kern Street
    • 6900 - 7200 Block of Norton Avenue
  • FPL Pole Removal/Replacement – Intermittent lane closure on North Tamarind Avenue between Palm Beach Lakes Boulevard and 25th Street through January 2026.
  • FPL Pole Removal - Intermittent lane and sidewalk closures at the locations listed below through January 2026:
    • 2800 - 2813 Parker Avenue
    • 2400 - 2401 Lake Avenue
    • 2000 - 2011 Lake Avenue
    • 3700 - 3709 South Olive Avenue
    • 400 - 431 Bunker Road
    • 300 - 300 Murray Road
    • 300 - 301 Edmore Road
    • 4400 - 4405 South Olive Avenue
    • 7500 - 7508 Martin Avenue
    • 7600 - 7604 Martin Avenue
    • 5600 - 5632 56th Way
    • 200 - 208 31st Street Court
    • 1100 - 1100 Village Boulevard
  • FPL - Intermittent lane and sidewalk closures at the locations below through January 16, 2026:
    • South Olive Avenue between Vallette Way and Wildermere Road
    • Vallette Way between South Olive Avenue and South Dixie Highway.
  • FPU - Intermittent lane and sidewalk closures at the locations below through March 2026:
    • North Shore Drive between 39th Street and 43rd Street.
  • Comcast - Intermittent lane and sidewalk closures at the following locations through January 16, 2026:
    • Clearwater Drive between Banyan Boulevard and Clearwater Place
    • Clearwater Place between Clearwater Drive and Clearwater Park Road

PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS ROAD CLOSURES IN THE CITY

  • 45th Street from Haverhill Road to Military Trail: FPL Underground Utility work. Periodic eastbound right lane closure, westbound right lane closure. Periodic northbound left turn lane closure on North Military Trail.
  • Summit Boulevard and Parker Avenue: FPL Utility Work. Periodic eastbound left turn lane closure and northbound right lane closure on Parker Avenue.
  • South Australian Avenue South of Mercer Avenue and Old Okeechobee Road: Periodic nighttime double northbound right lane closures. Northbound right turn lane closure for drainage installation.
  • For more information about PBC road closures, contact PBC Engineering & Public Works at (561) 684-4000 or visit the Road & Bridge Construction List

FLORIDA DEPT. OF TRANSPORTATION (FDOT) ROAD CLOSURES IN THE CITY OF WPB 

State Road (SR) 710/Beeline Highway Reconstruction Project (through late 2029)

  • Project Limits: 3.142-mile project in the cities of Palm Beach Gardens, Riviera Beach and West Palm Beach began on March 18, 2024.
  • Improvements consist of widening SR 710/Beeline Highway from Northlake Boulevard to SR 708/Blue Heron Boulevard from 4 lanes to 6 lanes, replacing and widening the Florida’s Turnpike bridge over SR 710/Beeline Highway, constructing an at-grade partial Continuous Flow Intersection (CFI) at the intersection of SR 710/Beeline Highway and Northlake Boulevard, adding sidewalks and bicycle lanes on both sides of SR 710/Beeline Highway, upgrading railroad crossings, drainage, signage, lighting, signalization and pavement markings throughout project limits, and upgrading Intelligent Transportation System (ITS).
  • State Road (SR) 710/Beeline Highway from SR 708/Blue Heron to Northlake Boulevard will have one inside lane closed in each direction, daily, 7 a.m. until 6 p.m., Monday through Friday.
  • SR 710/Beeline Highway and Northlake Boulevard will have one inside lane closed in each direction, daily, 10 a.m. until 5 p.m., Monday through Friday.
  • SR 710/Beeline Highway and Jog Road will have one inside lane closed in each direction, daily, 10 a.m. until 6 p.m., Monday through Friday.
  • SR 710/Beeline Highway and Haverhill Road will have one inside lane closed in each direction, daily, 7 a.m. until 6 p.m., Monday through Friday.
  • SR 710/Beeline Highway from Military Trail to Blue Heron Boulevard will have one lane closed in each direction, daily, 7 a.m. until 6 p.m., Monday through Friday.
  • SR 710/Beeline Highway Lane widths are reduced and westbound traffic has been shifted to the median from just east of the Turnpike to Blue Heron Boulevard to safely facilitate construction activities.
  • The SR 710/Beeline Highway northwest ramp to eastbound Northlake Boulevard has been temporarily closed to safely facilitate this phase of construction and is anticipated to reopen in Fall 2025. During this closure, motorists can continue on SR 710/Beeline Highway and turn right at the light to access eastbound Northlake Boulevard.

     

    S.R. 5/U.S. 1 Resurfacing, Restoration, and Rehabilitation Project (through Late 2026)

  • Project Limits: This 1.044-mile project on S.R. 5/U.S. 1 from Belvedere Road to south of Okeechobee Boulevard in the city of West Palm Beach is scheduled to begin in April 2026. Project Improvements consist of minor reconstruction, and milling and resurfacing the roadway throughout the project limits of S.R. 5/U.S. 1 from Belvedere Road to south of S.R. 704/Okeechobee Boulevard to enhance infrastructure resilience and safety for the community; reconstructing curb ramps to meet ADA criteria and replacing portions of the existing sidewalk to improve pedestrian safety, connectivity, and use; upgrading signing and pavement markings to enhance visibility and safety; replacing drainage structures within driveways; adding a new signalized mid-block crosswalk north of Vallette Way; upgrading pedestrian signalization at Belvedere Road and Flamingo Drive and the crosswalk north of Cranesnest Way; installing overhead flashing beacons within the school zone north and south of Flamingo Drive; and upgrading lighting to LED fixtures and installing a new light at Flamingo Drive.
  • All lanes currently open.

     

    S.R. 704/Okeechobee Boulevard Resurfacing, Restoration, and Rehabilitation Project (Early 2026)

  • Project Limits: This 0.608-mile project on State Road (S.R.) 704/Okeechobee Boulevard from Red Trail to west of Australian Avenue in West Palm Beach began on January 29, 2025. Work includes milling, repaving, and restriping the existing roadway within the project limits to ensure long-term infrastructure resilience and safety, upgrading pedestrian signals and lighting to LED fixtures at existing crosswalks to enhance pedestrian safety, replacing in-road sensors and traffic signal backplates to improve traffic flow and enhance safety for motorists, installing Wrong Way Driving Detection Systems (WWDS) at the S.R. 9/I-95 northbound and southbound exit ramps to S.R. 704/Okeechobee Boulevard to enhance motorist safety by detecting wrong-way drivers and preventing serious injury crashes on the State Highway System.
  • No lane closures

  CITY OF WEST PALM BEACH DOCKS

  • Currie Park Boat Docks and Ramps (2400 North Flagler Drive): Ramps are closed until spring 2027.
  • Lake Mangonia Park Boat Ramps (2957 North Australian Avenue): Ramps are open daily, from sunrise to sunset. 
  • Clematis Street Docks (South Clematis Street at South Flagler Drive): Docks are open daily, from 5 a.m. until midnight.
  • Fern Street Dock (Fern Street at South Flagler Drive): The dock is open daily from 5 a.m. until midnight. No overnight dockage is allowed for boats, dinghies, or kayaks. The Fern Dock is also the home of a West Palm Beach Marine Patrol Boat and the West Palm Beach Fire and Rescue Boat.

 

Tagged as: