To support critical underground utility improvements along North Flagler Drive and 26th Street, the City of West Palm Beach has implemented a series of temporary road closures. Click on the link for details and suggested detour.
Published on February 04, 2026
CITY OF WEST PALM BEACH ENGINEERING, PUBLIC WORKS & UTILITY ROAD CLOSURES
Currie Park (through spring 2027):
Sidewalk closure along project frontage
26th Street Utility Improvement Project (summer 2026):
No closures at the moment.
Chase Street & Trinity Place Streetscape (through summer 2026):
Chase Street closed between Trinity Place and Tanglewood Court
Trinity Place closed between Olive Avenue & Chase Street
Northmore Neighborhood Sidewalk Improvements (through summer 2026):
Intermittent Lane closure with flagging operations.
Clematis Garage Repair, 500 Banyan Boulevard (through May 2026)
Clematis Garage Exits/Entrances remain accessible. Expect delays and limited parking spaces.
City Center Garage Repair, 401 Clematis Street (through March 2026)
City Center Garage Exits/Entrances remain accessible. Expect delays and limited parking spaces.
North Flagler Drive Utility Improvements (early 2027)
Full closure on Flagler Drive between 33rd Court and 44th Street. Project is projected to start the week of February 23, 2026.
Tidal Valves Project (summer 2026)
No closures at the moment
FEC Railroad Crossing Pavement Markings and Signage:
EVENT ROAD CLOSURES
Clematis by Night – Thursday, February 5 (No Clematis by Night on Thursday, February 12): Note the following road closures will be in place:
Thursdays 1:30 p.m. to 10 p.m.:
North & South Clematis Streets between Narcissus Avenue and Flagler Drive
Lantana Avenue between Banyan Boulevard and North Clematis Street
Narcissus Avenue between Dramaworks Alley & North Clematis Street
Flagler Drive between Banyan Boulevard and Datura Street
Thursdays 5 p.m. to 9 p.m.
Flagler Drive between Banyan Boulevard & Datura Street.
GreenMarket – Saturday, February 7 & Saturday, February 14 – Note the following road closures will be in place:
Saturdays 5 a.m. to 3:30 p.m.:
100 blocks of North and South Clematis Streets.
200 – 400 block of Clematis Street.
Saturdays 7:15 a.m. to 2:15 p.m.
South Dixie Highway between Banyan Boulevard and Datura Street
South Olive Avenue between Banyan Boulevard and Datura Street
Narcissus Avenue between Banyan Boulevard and Datura Street
West Palm Beach Antique, Flea and Craft Market – Saturday, February 7 & Saturday, February 14, - Note the following road closures will be in place:
Saturdays 5 a.m. to 3:30 p.m.
200 – 400 block of Clematis Street
Saturdays 7:30 a.m. to 2:15 p.m.
The Norton Gala –through Friday, February 13, 2026 – Note the following road closures:
Through Friday, February 13 – Preparation for Gala
Jefferson Road closed between South Olive Avenue and South Dixie Highway
Saturday, February 7 – The Norton Gala 2026 – noon to 11:30 p.m.
Chadbourne Court Between South Olive Avenue and South Flagler Drive
South Olive Avenue Between Chadbourne Court & Cranesnest Way
Actaeon Place between South Olive Avenue & South Flagler Drive
Cranesnest Way between South Olive Avenue and South Dixie Highway
Community Wellness Fair – Saturday, February 7 – Note the following road closures:
8 a.m. to 3 p.m.
7th Street between Rosemary Avenue and Henrietta Avenue
8th Street between Rosemary Avenue and Henrietta Avenue
Henrietta Avenue between 7th Street and 8th Street
WPBPD Friday Night Blitz – Friday, February 6 – Note the following road closures:
4:30 pm to 9:30 pm
Cheerful Street closed between Merry Place and Comfort Street
West Palm Beach Green Food & Wine Fest, February 12 through February 16 – Note the following road closures:
Thursday, February 12, 2026, at 5 p.m. through Monday, February 16 at noon.
Palm Tree Festival Sunday, February 8 through Wednesday, February 18 – Note the Following road closures:
February 8 at 10 a.m. through February 18 at 5 p.m. (Setup and Breakdown)
Saturday, February 14 at 11 a.m. to 11:59 p.m.
200 Block of Clematis Street closed
Narcissus Street closed between Banyan Boulevard & Datura Street
PRIVATE PROJECT ROAD CLOSURES
Olara Boat Dock (through January 2028): No closures.
PBAU Business School (through March 2026): No road closures. Sidewalk closure along the frontage of the project.
PBAU Parking Garage & Residence Hall (through spring 2027):
No closures.
South Flagler House (through December 2026):
Diana Place is closed between South Olive Avenue and South Flagler Drive.
Sidewalk closure along the frontage of the project.
Southbound right lane closure on Flagler Drive until further notice.
Olive Avenue closed per the details below:
Through Friday, February 6
No closures
Saturday, February 7
Olive Avenue from Jefferson Road to Actaeon Place will be closed for the Norton Gala Event
February 9 – February 13
Full closure of Olive Avenue from Acacia Rodd to Actaeon Place
The District (through fall 2026):
Full closure on 23rd Street between Pinewood Avenue and Broadway Avenue until further notice.
The Spruce (through early 2026):
Sidewalk closure along the project frontage.
Intermittent lane closure on Spruce Avenue between 24th Street and 25th Street
NORA Hotel (through fall 2026) – Road closed between 10th Street and 11th Street on North Railroad Avenue.
NYU (through late 2026) – Eastbound Datura Street between South Dixie Highway and South Olive Avenue closed during the duration of the project.
Parking stalls are not accessible along Dixie Highway.
Sidewalk closure between Datura Street and Evernia Street
Square One East/West Towers (through late 2026):
Full closure on Gardenia Street between Rosemary Avenue & Quadrille Boulevard.
Daily flagging operations on Rosemary Avenue & Quadrille Boulevard for material deliveries.
Nottingham Townhomes (through early 2027)
Kirksey Commons (through early 2027)
15th Street closed between Spruce Avenue and North Dixie Highway until further notice.
Alba (spring 2027): No closures at the moment.
West Palm Pointe (spring 2028): No road closures. Sidewalk closure along Dixie Highway.
8111 South Dixie Highway (through spring 2027)
One eastbound lane closed on Gregory Road for construction staging until further notice.
Sidewalk closure along project frontage.
FRANCHISE UTILITY ROAD CLOSURES
FPL - Intermittent lane and sidewalk closures for overhead to underground conversion project through March 2026. Streets/blocks affected:
400 - Winters Street
400 - Wilder Street
400 - Forest Hill Boulevard
400 - Lytle Street
400 - Macy Street
400 - Hunter Street
500 - Franklin Road
500 - Nathan Hale Road
300 - Nathan Hale Road
100-200 Bloomfield Drive
300 Colonial Road
100-200 Santa Lucia Drive
300 Valley Force Road
100-200 Elwa Place
100-300 - Palmetto Lane
100-300 - Churchill Road
Brevard Avenue between Palmetto Street and Franklin Road
Martin Avenue between Palmetto Street and Franklin Road
South Olive Avenue between Churchill Road and Franklin Road
Washington Road between Elwa Place and Cortez Road
South Flagler Drive between Churchill Road and Cortez Road
FPU - Southside WPB Natural Gas Main replacement project. Intermittent lane closures on the following streets/blocks through February 2026:
200 - Gray Street
200 - Ashworth Street
100 - Alpine Road
100 - 200 - Beverly Road
100 - 200 - Costello Road
100 - 200 - Desota Road
100 - 200 - Miramar Way
100 - 200 - Summa Street
100 - 200 - Seville Road
100 - 200 - Alhambra Place
100 - 200 - Rutland Boulevard
100 - 200 - Gregory Place
100 - 200 - Gregory Road
100 - 200 - Arlington Road
100 - Arlington Place
6500 - 7900 - Washington Road
8000 - Flagler Court
6800 - 8000 - South Flagler Drive
FPL - Pole Replacement Program. Intermittent lane closures on the following streets/blocks through March 2026:
1100 – 2100 Block Clare Avenue.
900 - 1000 Block Caroline Street.
1400 - 1800 Block Elizabeth Avenue.
1000 Block Blanche Street.
1200 Block Worthington Street.
1200 Block Roebuck Court
1400 Block Edgar Street
Flagler Promenade South
Worth Court
Worth Court North
Worth Court South
100-300 Block of Edmor Road
200-300 Block of Rilyn Drive
100-300 Block of Russlyn Drive
100-300 Block of Murray Road
4300-4800 South Dixie Highway
4300-4800 South Olive Avenue
4100-4400 Washington Road
4800 McKenna Lane
4100-4900 South Flagler Drive
FPL Norton phase 8 -Intermittent lane and sidewalk closures for overhead to underground conversion project through March 2026. Streets/blocks affected:
400 Block of Maddock Street
400 Block of Barnett Street
400 Block of Kern Street
6900 - 7200 Block of Norton Avenue
FPL Pole Removal/Replacement – Intermittent lane closure on North Tamarind Avenue between Palm Beach Lakes Boulevard and 25th Street through February 2026.
FPU - Intermittent lane and sidewalk closures at the locations below through March 2026:
North Shore Drive between 39th Street and 43rd Street.
IKE Smart Kiosk – Intermittent lane and sidewalk closures on North Olive Avenue between Banyan Boulevard and Clematis Street through March 2026
PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS ROAD CLOSURES IN THE CITY
45th Street from Haverhill Road to Military Trail: FPL Underground Utility work. Periodic eastbound right lane closure, westbound right lane closure. Periodic northbound left turn lane closure on North Military Trail.
North Australian Avenue from 25th Street to 200 feet North of 25th Street: Periodic northbound right lane and west bound right lane closures for driveway removals and installation.
Summit Boulevard and Parker Avenue: FPL Utility Work. Periodic eastbound left turn lane closure and northbound right lane closure on Parker Avenue.
South Australian Avenue South of Mercer Avenue and Old Okeechobee Road: Periodic nighttime double northbound right lane closures. Northbound right turn lane closure for drainage installation.
Tri-Rail railroad crossing between Carver Avenue and Windsor Avenue
Full closure Friday, February 6 beginning at 9 p.m. through Tuesday, February 10, at 4 a.m. for railroad track rehabilitation
For more information about PBC road closures, contact PBC Engineering & Public Works at (561) 684-4000 or visit the Road & Bridge Construction List
FLORIDA DEPT. OF TRANSPORTATION (FDOT) ROAD CLOSURES IN THE CITY OF WPB
State Road (SR) 710/Beeline Highway Reconstruction Project (through late 2029)
Project Limits: 3.142-mile project in the cities of Palm Beach Gardens, Riviera Beach and West Palm Beach began on March 18, 2024.
Improvements consist of widening SR 710/Beeline Highway from Northlake Boulevard to SR 708/Blue Heron Boulevard from 4 lanes to 6 lanes, replacing and widening the Florida’s Turnpike bridge over SR 710/Beeline Highway, constructing an at-grade partial Continuous Flow Intersection (CFI) at the intersection of SR 710/Beeline Highway and Northlake Boulevard, adding sidewalks and bicycle lanes on both sides of SR 710/Beeline Highway, upgrading railroad crossings, drainage, signage, lighting, signalization and pavement markings throughout project limits, and upgrading Intelligent Transportation System (ITS).
State Road (SR) 710/Beeline Highway from SR 708/Blue Heron to Northlake Boulevard will have one inside lane closed in each direction, daily, 7 a.m. until 6 p.m., Monday through Friday.
SR 710/Beeline Highway and Northlake Boulevard will have one inside lane closed in each direction, daily, 10 a.m. until 5 p.m., Monday through Friday.
SR 710/Beeline Highway and Jog Road will have one inside lane closed in each direction, daily, 10 a.m. until 6 p.m., Monday through Friday.
SR 710/Beeline Highway and Haverhill Road will have one inside lane closed in each direction, daily, 7 a.m. until 6 p.m., Monday through Friday.
SR 710/Beeline Highway from Military Trail to Blue Heron Boulevard will have one lane closed in each direction, daily, 7 a.m. until 6 p.m., Monday through Friday.
SR 710/Beeline Highway Lane widths are reduced and westbound traffic has been shifted to the median from just east of the Turnpike to Blue Heron Boulevard to safely facilitate construction activities.
The SR 710/Beeline Highway northwest ramp to eastbound Northlake Boulevard has been temporarily closed to safely facilitate this phase of construction and is anticipated to reopen in Fall 2025. During this closure, motorists can continue on SR 710/Beeline Highway and turn right at the light to access eastbound Northlake Boulevard.
S.R. 5/U.S. 1 Resurfacing, Restoration, and Rehabilitation Project (through Late 2026)
Project Limits: This 1.044-mile project on S.R. 5/U.S. 1 from Belvedere Road to south of Okeechobee Boulevard in the city of West Palm Beach is scheduled to begin in April 2026. Project Improvements consist of minor reconstruction, and milling and resurfacing the roadway throughout the project limits of S.R. 5/U.S. 1 from Belvedere Road to south of S.R. 704/Okeechobee Boulevard to enhance infrastructure resilience and safety for the community; reconstructing curb ramps to meet ADA criteria and replacing portions of the existing sidewalk to improve pedestrian safety, connectivity, and use; upgrading signing and pavement markings to enhance visibility and safety; replacing drainage structures within driveways; adding a new signalized mid-block crosswalk north of Vallette Way; upgrading pedestrian signalization at Belvedere Road and Flamingo Drive and the crosswalk north of Cranesnest Way; installing overhead flashing beacons within the school zone north and south of Flamingo Drive; and upgrading lighting to LED fixtures and installing a new light at Flamingo Drive.
All lanes currently open.
S.R. 704/Okeechobee Boulevard Resurfacing, Restoration, and Rehabilitation Project (Early 2026)
Project Limits: This 0.608-mile project on State Road (S.R.) 704/Okeechobee Boulevard from Red Trail to west of Australian Avenue in West Palm Beach began on January 29, 2025. Work includes milling, repaving, and restriping the existing roadway within the project limits to ensure long-term infrastructure resilience and safety, upgrading pedestrian signals and lighting to LED fixtures at existing crosswalks to enhance pedestrian safety, replacing in-road sensors and traffic signal backplates to improve traffic flow and enhance safety for motorists, installing Wrong Way Driving Detection Systems (WWDS) at the S.R. 9/I-95 northbound and southbound exit ramps to S.R. 704/Okeechobee Boulevard to enhance motorist safety by detecting wrong-way drivers and preventing serious injury crashes on the State Highway System.
No lane closures
For more information, contact FDOT at (866) 336-8435 or http://www.fdot.gov/
CITY OF WEST PALM BEACH DOCKS
Currie Park Boat Docks and Ramps (2400 North Flagler Drive): Ramps are closed until spring 2027.
Lake Mangonia Park Boat Ramps (2957 North Australian Avenue): Ramps are open daily, from sunrise to sunset.
Clematis Street Docks (South Clematis Street at South Flagler Drive): Docks are open daily, from 5 a.m. until midnight.
Fern Street Dock (Fern Street at South Flagler Drive): The dock is open daily from 5 a.m. until midnight. No overnight dockage is allowed for boats, dinghies, or kayaks. The Fern Dock is also the home of a West Palm Beach Marine Patrol Boat and the West Palm Beach Fire and Rescue Boat.